WMAF primary pipe kits for Wessex Modumax gas boilers

Applications

New installations, renovations, ideal for packaged plant room applications
Primary pipe cascade sets for Wessex Modumax gas boilers of condominiums, public facilities, office buildings, industrial halls up to 1500 kW total power range.
 
Each pipe set can be installed separately or in a group of modules. The prefabricated parts can be assembled on site quick and easy.
The assembled modules become a complete space-saving calorific centre for any plant room.
Accessible free standing construction results easy handling and makes subsequent thermal insulation cost-effective.
Small footprint requiring spatial arrangement allows reconstructions to be performed even during the heating season, while the old system keeps working in the same room.
FÉG VESTALE compatible modules can be connected.
The hydraulic layouts meet the requirements of most boiler and control system manufacturers.  They can be easily extended and modified later according to the changing needs of any intelligent and versatile building system.
Downloadable technical drawings, detailed technical descriptions and a computerized selection program helps the designers to expedite the preparation of project documentation.
 

Module type

for Wessex Modumax Floor Standing Condensing Gas boilers.
Click on the picture for applicable models.

 

WMAF/1

Hydraulic and gas connection cascade primary pipe kit for two 100kW or 120kW gas boilers  built over each other.

 

WMAF/2

Hydraulic and gas connection cascade primary pipe kit for three 100kW or 120kW gas boilers  built over each other.

 

WMAF/3

Hydraulic and gas connection cascade primary pipe kit for two pieces of 150kW 200kW or 250kW gas boilers built over each other. The kit contains the low loss header to be connected to the left side of the heat consuming modules when they are viewed from their heating return side.

Standard model

WMAFC/3

Hydraulic and gas connection cascade primary pipe kit for two pieces of 150kW 200kW or 250kW gas boilers built over each other. The kit contains the low loss header to be connected to the right side of the heat consuming modules when they are viewed from their heating return side.

Optional

WMAFD/3

Hydraulic and gas connection cascade primary pipe kit for two pieces of 150kW 200kW or 250kW gas boilers built over each other. The kit is without  a low loss header to be connected to the right side of the heat consuming modules when they are viewed  from their heating return side.

Applicable together  with a standard model only

WMAF/4

Hydraulic and gas connection cascade primary pipe kit for three pieces of 150kW 200kW or 250kW gas boilers built over each other. The kit contains the low loss header to be connected to the left side of the heat consuming modules when they are viewed from their heating return side.

Standard model

WMAFC/4

Hydraulic and gas connection cascade primary pipe kit for three pieces of 150kW 200kW or 250kW gas boilers built over each other. The kit contains the low loss header to be connected to the right side of the heat consuming modules when they are viewed from their heating return side.

Optional

WMAFD/4

Hydraulic and gas connection cascade primary pipe kit for three pieces of 150kW 200kW or 250kW gas boilers built over each other. The kit is without a low loss header to be connected to the right side of the heat consuming modules when they are viewed from their heating return side.

Applicable together  with a standard model only

 

Quotation/Order


Quantity:

Enquirer*:


Name*:

E-mail*:

Phone*:

Request*:



Downloads